Transit, Roundabout, Trail
Transit, Roundabout, Trail

To fulfill the requirements of FAST Act and maximize the efficiency, accessibility, and safety of the Metropolitan Planning Area’s transportation system, the goals and objectives of the Green Bay MPO 2045 Long-Range Transportation Plan are designed to be consistent with the seven federally-mandated surface transportation elements and to be as precise and measureable as possible. 


Draft Green Bay Metropolitan Planning Organization (MPO) 2045 Long-Range Transportation Plan Update, May 2020

 
 Draft Chapter 1 - Goals and Objectives 
Draft Chapter 2 -  Existing Transportation System 
Draft Chapter 3 – Transportation System Performance Measures
Draft Chapter 4 – Future Transportation System 
Draft Chapter 5 – Financial Capacity Analysis
Draft Chapter 6 – General Recommendations Summary 
Draft Appendices 

























 
 
Green Bay Metropolitan Planning Organization (MPO) 2045 Long-Range Transportation Plan (October 7, 2015)